Developer Updated daily
Switch
Public construction-phase signals tied to Switch across the AI infrastructure buildout.
Tracked signals
57
Sectors
3
Type
—
ScopePlex has tracked 57 public construction signals tied to Switch across 3 sectors — Power, Data Center, Battery Supply Chain. Each is a public, confidence-scored record — permit filings, EPC awards, interconnection entries, and capex disclosures — that marks where Switch is moving through the construction pipeline. For BD teams at specialty contractors, that is the early-warning trail for positioning ahead of the formal RFP.
Active in
Recent public signals
Jul 13
ERCOT 29INR0120: MilamStation Power Secured Gas Generation
Jul 13
ERCOT 29INR0172: Sweetheart BESS
Jul 13
ERCOT 30INR0002: Southeast Oklahoma Pumped Storage
Jul 13
ERCOT 28INR0327: 18-BRAVO BESS
Jul 13
ERCOT 27INR0216: Champs Elysees BESS
Jul 13
ERCOT 26INR0605: White Bright BESS
Jul 13
ERCOT 27INR0576: Trailblazer BESS
Jul 13
ERCOT 27INR0575: Trailblazer Natural Gas Generation Plant
Jul 13
ERCOT 27INR0422: M-Bar BESS I
Jul 13
ERCOT 27INR0412: Spinosa BESS
Jul 13
ERCOT 27INR0234: Lima Solar Project
Jul 13
ERCOT 27INR0291: Nouveau BESS
Jul 13
ERCOT 28INR0323: Velociraptor BESS II
Jul 13
ERCOT 27INR0409: Baker Branch BESS
Jul 13
ERCOT 26INR0550: Grand Mesa BESS
Jul 13
ERCOT 27INR0050: Darkwood BESS
Jul 13
ERCOT 28INR0157: Axtell BESS
Jul 13
ERCOT 27INR0029: Short Creek BESS
Jul 13
ERCOT 25INR0440: Bronc Rodeo Solar Project
Jul 13
ERCOT 25INR0396: Stewart Grady BESS
Jul 13
ERCOT 24INR0544: Wetzel BESS
Jul 13
ERCOT 26INR0280: Pethrus BESS
Jul 13
ERCOT 24INR0543: Thomas Cameron BESS
Jul 13
ERCOT 26INR0472: Bologna BESS
Jul 13
ERCOT 26INR0465: Lavita BESS
Gated intelligence
The facts are public. The intelligence is behind signup.
- Confidence score on every signal
- "Why it matters" — the BD read on each move
- Timing window & who to call
- Your curated daily brief, filtered to your sectors
- Saved pursuits, company watchlists & alerts
Unlock Switch intelligence →7-day trial · no card required