AI Buildout Radar

Track the AI buildout before it becomes obvious.

Every morning in your inbox: permits, interconnection filings, awards, and capex moves powering the AI infrastructure wave — filtered to your sectors, searchable forever.

Start free — $9.99/mo $14.99 See a sample brief
Permits · dockets · interconnection queuesThemed: PROJECT · POWER · SUPPLYDaily digest · weekly recap
Ticker
AWS files permit for 142MW Loudoun campus expansionEQUINIX SV8 — 180MW expansion enters PJM queueTSMC Arizona Phase-2 mech RFQ posted, bids due May 14GE Vernova wins transformer order for Dominion grid upgradeANTHROPIC + CoreWeave — 48MW Texas datacenter LOIAWS files permit for 142MW Loudoun campus expansionEQUINIX SV8 — 180MW expansion enters PJM queueTSMC Arizona Phase-2 mech RFQ posted, bids due May 14GE Vernova wins transformer order for Dominion grid upgradeANTHROPIC + CoreWeave — 48MW Texas datacenter LOI
Today's brief · top 3
Fresh · 4 min ago
Data centerAshburn · VA
AWS files permit for 142MW campus expansion, Loudoun County
Why it matters
Permit-stage filing. Estimated 90-day window before the GC pre-qual list closes — you'll want to be talking to Clark before RFQ drops.
CONF 0.91·Scope: electrical, mechSource →
PowerPJM
Equinix SV8 enters PJM interconnection queue at 180MW
Why it matters
Matches your Power & Grid bundle. Queue position will inform ISO study timing.
CONF 0.88·PJM · 3h agoSource →
SemiPhoenix · AZ
TSMC Arizona posts RFQ for Fab-21 Phase-2 mechanical package
CONF 0.84·Bid due May 14Source →
Primary sources · updated 4h agoOpen the full brief →
Saved per day
4 hrs
vs. manual trade-mag scanning
Sources monitored
137
Growing weekly
Refresh cadence
6 hrs
Always current
Coverage
24/7
Never miss a lead
The newsroom, for BD

A pre-dawn brief, assembled by people — not an alert firehose.

Reading permit portals, utility dockets, and trade feeds isn't an AI-buildout strategy. ScopePlex does that work overnight, filters by the parts of the buildout you track, and hands you a ranked shortlist every morning — with the context you'd need to act on it.

01
Intake

Every permit, award, and phase change — before it's gossip.

We index utility queues, PUC dockets, AHJ permit portals, agency RFQs, press releases and twelve sector-specific wire services. Each signal is verified by a human analyst before it ships.

Last 14 days▲ 218 approved · 47 this week
02
Ranking

Confidence you can actually bet a bid team on.

Every lead gets a score — based on source credibility, recency, and match to your preferences. Scoped tags tell you exactly which trades the work hits. The filler sinks, the gems float.

0.91
Permit · AWS
0.88
GB · Sutter
0.84
RFQ · TSMC
0.72
Award · UCM
0.51
Rumor · SFO
Why email

Your inbox is the archive.

Every digest lands in Gmail or Outlook. Search it, star it, forward it to your team. No extra login. No dashboard to remember. The intelligence you need, in the tool you already live in.

Searchable forever

Every morning's brief is indexed in your email client. Search by project name, company, or sector — no ScopePlex login needed.

Forward to your team

One click shares the entire brief. Your BD team sees the same signal at the same time.

Works with your existing tools

Gmail, Outlook, Apple Mail — wherever you work. No new app to install or remember to open.

A day in ScopePlex

From overnight signal to pinned pursuit — in the time it takes to pour a coffee.

Click any step on the left to see the same day unfold across the product. The same leads from the brief above flow into pursuits, track company activity, and feed the pipeline you already manage.

VOL. 02 · ISSUE 47WEDNESDAY · MAY 14● LIVE
TICKERAWS · 142MW · Dominion · PJM queue +12 · TSMC AZ Phase 2 · $8.2B · Equinix SV8 MEP · $42M negotiation
TODAY'S BRIEF · TOP 306:42 EDT
DATA CENTERLOUDOUN CO, VA
AWS acquires 142 MW reservation at Dominion Energy substation — Phase 2 construction permit filed
WHY IT MATTERSFirst DC campus in this corridor confirmed as AWS. Mechanical, electrical, and plumbing scopes follow within 60 days of permit approval.
CONF 0.91PJM Interconnection Queue
POWER & GRIDASHBURN, VA
Equinix PJM interconnection application: 180 MW, projected energization Q3 2027
WHY IT MATTERSEquinix's largest single interconnection request in PJM history signals a new campus, not expansion of existing. Design-build window opens on filing.
CONF 0.87FERC eLibrary
SEMICONDUCTORPHOENIX, AZ
TSMC Arizona Fab 21 Phase 2 — $8.2B capex approved by board, EPC RFP expected Q2
WHY IT MATTERSBoard approval locks the spend. Intel and Samsung fab scopes have followed this same pattern within 45 days. Track the RFP for packaging/MEP.
CONF 0.83SEC 6-K Filing
Primary sources · updated 4h agoOpen the full brief →
How it works

Four steps. None of them are reading a permit portal.

01
Tell us what you track

AI Buildout — or narrow it to one slice.

Pick the AI Buildout bundle to cover the full stack (data centers, power & grid, semis, storage, industrial supply chain) — or pick a single category. Add the companies and projects you're already tracking; we'll flag every time they move.

02
We monitor 24 / 7

Primary sources, verified overnight.

Permits, interconnection filings, EPC awards, RFQs, utility dockets, earnings calls, and trade wires. Every signal is read, ranked, and reviewed by a human analyst before it ships to you.

03
You get a brief

One email. One dashboard. Zero alert fatigue.

Dawn brief at 06:42 local — headline, context, confidence, source. Act directly on the row, or open it in the dashboard to pin to a pursuit.

04
You act

Pin → pursuit → pipeline.

One click turns a news item into a lead, pursuit, or tracked company — prefilled. The pipeline you already use gets new rows, not new tabs.

Primary sources · adding weekly

The places your competitors aren't reading.

Loudoun AHJFERC eLibraryDataCenter DynamicsENRCPUC docketSFGATE BizUCOP procurementEPA ECHOReuters energyTexas RRCBisnowTSMC supplier portalMidAtlantic PJMSemiconductor DigestDOT-FAA filingsNYC DOBIndustrial InfoABC Fed CtrsCA AHJ — 58 countiesPower Engineering+117 more
Pricing · 3 tiers

Start with the daily digest. The platform comes next.

Every paid plan starts with a 7-day free trial. No credit card charges until the trial ends.

⚡ Founding rate — limited spotsEnds soon
Daily Intelligence Brief
$9.99
$14.99/ mo
Save 33% · founding rate

79+ regulatory databases monitored overnight — scored, bucketed, and in your inbox before 7am.

  • ACT SOON · RESEARCH · WATCH — pre-triaged for you
  • PJM, CAISO, MISO & SPP interconnection queue filings
  • Municipal permit APIs — Dallas, Fort Worth, Fairfax, Loudoun
  • Confidence scoring 0–1, only leads above 0.40 reach you
  • Sector-filtered to your bundles
  • Dashboard & CRM pipelinecoming soon
Start free — $9.99/mo today
Coming soon
Platform
$29/ mo

Full platform for active BD teams.

  • Everything in Daily Intelligence Brief
  • Infrastructure scope tags
  • Dashboard & live feed
  • Full archive & search
  • CRM pipeline
  • Company tracking
  • AI summariespro only
  • 365-day backfillpro only
Notify me when available
Coming soon
Pro
$49/ mo

Full intelligence stack for serious BD teams.

  • Everything in Platform
  • Infrastructure scope tags
  • AI summaries per lead
  • 365-day backfill on activation
  • Priority analyst review
  • Company watchlists with signal alerts
  • Pipeline with stage attribution
Notify me when available
Field report
We pulled a $14M MEP pursuit out of a ScopePlex permit filing six weeks before it hit the trade mags. That one lead paid for five years of Pro.
JM
Jordan Marshall
VP · Business development · West Coast MEP firm
Frequently asked

The questions BD teams ask before they sign.

Don't see yours? Email help@scopeplex.app and you'll get a human reply, usually within the hour.

Q.01How is this different from a Bloomberg Terminal, an analyst newsletter, or a Dodge feed?+
Those give you everything; we give you the brief. We don't dump 10,000 rows into your inbox every day — we hand you the 5–20 buildout signals that actually matter to the parts of the AI infrastructure stack you track, with the context you'd need to act, ranked by a human.
Q.02Where do the sources come from?+
A mix of primary evidence (AHJ permits, PUC and SCC dockets, FERC filings, ISO interconnection queues from PJM/MISO/CAISO/SPP), industry trade press (Data Center Dynamics, Power Engineering, Utility Dive, Construction Dive, ENR), and owner-direct feeds. We add sources weekly based on what customers in each bundle ask for.
Q.03What's the human-review part mean?+
Every lead that ships to you has been read by an analyst who's tagged it, assigned a confidence score, and written the "why it matters" paragraph. If we can't corroborate a signal, it doesn't go out.
Q.04What parts of the AI buildout do you track?+
Data centers, power & grid, semiconductors, energy storage, and the industrial supply chain that supports them. Pick a single category or take the AI Buildout bundle, which covers the full stack. Adjacent sectors (oil & gas, chemical, pharma, food & bev, metals & mining, terminals, alt fuels, pulp/paper) are still ingested and will surface if they intersect a buildout signal you track.
Q.05Can I cancel? What happens to my pinned pursuits?+
Cancel anytime from your account. Your pursuit data is yours — export to CSV or keep your account in read-only mode on the Free tier.
Tomorrow's brief, free, in your inbox.

Join BD teams who find the project before the RFQ drops.

Start free — no card. Your first brief lands on the next business morning. Upgrade only if it's paying for itself.

Start free Book a 20-min demo
NO CREDIT CARD · UNSUBSCRIBE ANY TIME · HUMAN-REVIEWED