Monitored source Updated every 6h
Utility Dive Data Center Coverage
Utility Dive Data Center Coverage is an industry-news source covering tied power that ScopePlex monitors daily for construction-phase signals. 76 public signals tracked.
Utility Dive Data Center Coverage has contributed 76 public, confidence-scored construction signals tracked by ScopePlex. As an industry-news source, it surfaces tied power construction activity — awards, financings, and groundbreakings — that ScopePlex cross-checks against primary records before a signal is published. For BD teams at specialty contractors, watching this source is one input into knowing which tied power projects are entering the window where subcontract relationships are won — before the formal RFP.
Signals tracked
76
Class
industry news
Type
rss
In this sector
Related sources in Power
Recent public signals from this source
Jul 28
CenterPoint says 14 GW likely eligible for Texas’ ‘Batch Zero’ large-load interconnection
Jul 27
PG&E says it has 12.7 GW in data center pipeline as it courts smaller loads
Jul 23
GE Vernova gas turbine backlog climbs to 116 GW
Jul 21
SRP to propose mixed-resource project to its board in September
Jul 21
Data centers drove $6.3B in PJM capacity auction costs: market monitor
Jul 16
Indiana regulators investigate utility ROEs, ‘trackers’ in affordability review
Jul 16
Google inks deal for massive Arkansas solar and storage project
Jul 14
Utilities requested $9.2B in rate hikes in Q2: PowerLines
Jun 30
Duke gives up offshore wind lease for ‘partial’ reimbursement under Interior deal
Jun 29
PJM opposes waiver for $2B gas-fired plant in fast-track interconnection review
Jun 29
445 GW — mainly solar, storage — to come online by 2030 as demand growth surges: ICF
Jun 25
Texas landowners seek pause in $2B, 765-kV transmission line case over notice concerns
Jun 25
California to sue Trump administration over offshore wind buybacks
Jun 24
Platte River, EnergyHub partner to deploy 39-MW Colorado VPP
Jun 24
3 home energy providers offer 16.8 GW of distributed capacity to utilities, hyperscalers
Jun 23
Texas, facing 438 GW queue, approves initial large-load interconnection process
Jun 23
TVA considers up to 26 GW of gas-fired generation
Jun 18
Trump administration buys out 4 more offshore wind leases for $765M
Jun 16
Energy Dome, Salt River Project to build 19-MW CO2 battery system
Jun 10
FERC approves PJM fast-track review for ‘shovel-ready’ power projects
Jun 9
In PJM, power developers are ready to build but need data center contracts, transmission
Jun 8
Microsoft seeks Nevada tariff to shield ratepayers from data center costs
Jun 5
DOE orders OUC’s 465-MW coal unit in Florida to continue running
Jun 5
Trump administration announces $850M to modernize US coal capacity, build 2 new plants
Jun 3
7 states sue Trump administration over TotalEnergies offshore wind lease buyout
Gated intelligence
The facts are public. The intelligence is behind signup.
- Confidence score on every signal
- "Why it matters" — the BD read on each move
- Timing window & who to call
- Your curated daily brief, filtered to your sectors
- Saved pursuits, company watchlists & alerts
Unlock Utility Dive Data Center Coverage intelligence →7-day trial · no card required