Leon · Power
Great Rock Energy Center III
AI SUMMARIZEDBlack Mountain Energy Storage II filed ERCOT interconnection request 29INR0418 (first recorded Nov 2, 2026) for Great Rock Energy Center III, a proposed 990.6 MW gas-fired power plant in Leon County, Texas. Recorded ERCOT queue status: screening study started, full interconnection study started, no interconnection agreement signed yet. Expected commercial operation is May 15, 2029, with no EPC contractor recorded on the queue filing. It is part of a 2-phase Black Mountain Energy Storage II complex in Leon County totaling 1,292 MW alongside Great Rock BESS.
AI-assisted summary of public filings. AI can make mistakes; verify details against the primary agency filing. Terms.
Full record
What is in the full record
Full records, open to everyone
Free sample records from other ScopePlex projects (not filings for this project).
Get the projects filed in your area
Free. One email a week. Unsubscribe anytime.
Questions
What is Great Rock Energy Center III?
Black Mountain Energy Storage II filed ERCOT interconnection request 29INR0418 (first recorded Nov 2, 2026) for Great Rock Energy Center III, a proposed 990.6 MW gas-fired power plant in Leon County, Texas. Recorded ERCOT queue status: screening study started, full interconnection study started, no interconnection agreement signed yet. Expected commercial operation is May 15, 2029, with no EPC contractor recorded on the queue filing. It is part of a 2-phase Black Mountain Energy Storage II complex in Leon County totaling 1,292 MW alongside Great Rock BESS.
Where is it?
Leon, TX.
Who filed it?
Black Mountain Energy Storage II, per the record.